Category
Coming Soon
47 products
Showing 1 - 24 of 47 products
Our New Truck is arriving July 19, 2025 at 8am! We will be processing the products over the coming weeks - as they are cleared to go for sale they will make their way to the newest merch tab!
Showing 1 - 24 of 47 products
Display
View


CyberPower 5-Outlet, 1 USB-A, 1 USB-C Surge Protector with 4 ft. cord P504UC
Sale price$5.00
Regular price$10.00
Sold out

androme 8 in. Widespread Double Handle High-Arc Bathroom Faucet with Metal Pop-up Drain Lead-Free in Matte Black H0300B
Sale price$42.50
Regular price$85.00
Sold out

Nestfair 52 in. LED Modern Indoor Nickel Walnut Quiet Reversible Ceiling Fan with Lights Remote Control CHE534
Sale price$105.00
Regular price$210.00
Sold out

BWE Double Handles 4 Holes Standard Kitchen Faucet Sink With Side Sprayer in Matte Black A-92010-Black
Sale price$32.50
Regular price$65.00
Sold out

Hampton Bay- Rhodes 28 in. Bronze Table Lamp with Natural Linen Shade
Sale price$30.00
Regular price$60.00
Sold out

Hampton Bay 12-Light 24 ft. Indoor/Outdoor Plug-In Incandescent Edison Bulb String Light
Sale price$17.50
Regular price$35.00
Sold out

GAGALIFE 4 in. Centerset Double Handle High Arc Bathroom Sink Faucet with Pull Out Sprayer and Pop Up Drain in Brushed Nickel HWC-FX-CL-SB-N
Sale price$30.00
Regular price$60.00
Sold out

LNC Classic 1-Light Brass Pendant Light Modern Kitchen Island Dining Room Chandelier with Clear Water Wave Glass Globe LRNIFZZ527529C
Sale price$75.00
Regular price$150.00
Sold out

Superior Pump 1/4 HP Submersible Thermoplastic Utility Pump Kit 91299
Sale price$35.00
Regular price$70.00
Sold out

Commercial Electric 2 ft. Garage LED Linkable Strip Light Fixture Plug-in Hardwire 900 Lumens 10-Watt 4000K Bright White 5 ft. Power Cord
Sale price$15.00
Regular price$30.00
Sold out
Hampton Bay 21 in. 3-Light Oil-Rubbed Bronze Contemporary Bathroom Vanity Light with Frosted Patterned Glass Shade RS254664
Sale price$40.00
Regular price$80.00
Sold out

KeonJinn 48 in. W x 30 in. H Rectangular Frameless LED Light Anti-Fog Wall Bathroom Vanity Mirror with Backlit hd-YKLBG12176
Sale price$127.50
Regular price$255.00
Sold out

HOMLUX 24 in. W x 32 in. H Rectangular Frameless LED Light with 3-Color and Anti-Fog Wall Mounted Bathroom Vanity Mirror 51F3004D8F
Sale price$132.50
Regular price$265.00
Sold out
Everbilt 24 in. x 30 in. Steel Return Air Filter Grille in White
Sale price$32.50
Regular price$65.00
Sold out

KICHLER Independence 24 in. 3-Light Brushed Nickel Traditional Bathroom Vanity Light with Frosted Glass Shade 5337NIS
Sale price$27.50
Regular price$55.00
Sold out

Rennnsan Terry 3-Light Black Farmhouse Linear Island Chandelier Light with Rattan Shades CL8101-62128
Sale price$112.00
Regular price$225.00
Sold out

LNC Farmhouse 31.5 in. 6-Light Solid Wood Candlestick Chandelier with Black Rectangle Frame for Dining Room Kitchen Island A03429
Sale price$105.00
Regular price$210.00
Sold out
Volume Lighting 1-Light Indoor Brushed Nickel Mini Semi-Flush Mount Ceiling Fixture with White Alabaster Glass Bowl / Saucer Shade V7020-33
Sale price$12.50
Regular price$25.00
Sold out

LNC Modern 22.8 in. 3-Light Black Bathroom Vanity Light with Bell Clear Glass Shades Contemporary Wall Sconce Over Mirrors YNQ3IYLWS152BL9
Sale price$55.00
Regular price$110.00
Sold out

Philips Wireless Plug-In Door Bell Kit with 8 Melodies and 1 Push Button DES2180W/27
Sale price$10.00
Regular price$20.00
Sold out

Glacier Bay Lancaster 21 in. W x 8 in. D x 26 in. H Surface-Mount Shaker Bathroom Storage Wall Cabinet in White B25X20334
Sale price$100.00
Regular price$200.00
Sold out

BWE 1-Spray Patterns with 2.5 GPM 10 in. Wall Mount Round Design-Pressure Boosting Fixed Shower Head in Polished Chrome A-9H7829-C-10
Sale price$20.00
Regular price$40.00
Sold out

U.S. TRENCH DRAIN Compact Series 5.4 in. W x 3.2 in. D x 39.4 in. L Trench and Channel Drain with Black Grate
Sale price$15.00
Regular price$30.00
Sold out
NDS 2 ft. Plastic Spee-D Channel Drain Grate in Gray 241-1
Sale price$7.50
Regular price$15.00
Sold out
Filters (0)
